Construction of formal drain system for the draining of rainwater in places getting flooded with rainwater up to the culvert constructed across the railway line to drain out the rainwater in Krawegoda area in Rajgama
Painting of Wards,Obtaining the Container Box for storing Bed Ticket,Repairing of Toilet System And Installation of a new Central Air Conditioning System