BALANCE PIPE INSTALLATION, INTERCONNECTING PIPING IN THE CHILLER PLANT ROOM AND THE ROOFTOP COOLING TOWER AREA, AND TESTING & COMMISSIONING OF MVAC EQUIPMENT IN BLOCK 01, 02, AND 08 OF DHQC PROJECT, AKUREGODA
3mm Thick Vinyl Paving at the Department Floors and Ceramic Floor Tiling to Corridors at Proposed Department of Pediatrics of the Faculty of Medicine, University of Colombo
SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF GRID-TIED ROOF MOUNTED SOLAR PV GENERATION SYSTEM AT MAIN GARAGE HANGER (187kWp) & NEW BUILDING (100 kWp) AT CPSTL, OIL INSTALLATION KOLONNAWA