OBTAINING TOYOTA AXIO HYBRID CAR, FULL OPTION WITH A/C, MANUFACTURED IN THE YEAR 2016 OR THEREAFTER, WITH DRIVER ON HIRE BASIS FOR A PERIOD OF ONE (01) YEAR
Carpeting of Gamakumbura Kudalunuka Yalwela Road (6+000-8+000km/9+000-9+340km)". It should be amended as "Carpeting of Gamakumbura Kudalunuke Yalwela Road (3+250-4+550km/9+000-9 +350km)
OBTAINING TOYOTA AXIO HYBRID CAR, FULL OPTION WITH A/C, MANUFACTURED IN THE YEAR 2016 OR THEREAFTER, WITH DRIVER ON HIRE BASIS FOR A PERIOD OF ONE (01) YEAR
Reconstruction of Nelum Wewa situated within Kottukachchiya Farm in Puttalam District Cutting Out 68,495 Sq. Metres of Soil from inside the Wewa, Stockpile and Transport